
Page 5
1. Remove the front panel.
2. Rotate the control thermostat knob fully counter-
clockwise to the “OFF” position and replace the
panel.
3. Insert an empty funnel into the funnel rails.
4. Place a decanter containing a small amount of
water on the warmer beneath the funnel.
5. Connect the brewer to the power source, place
the On/Off brew station warmer switch the up-
per
position, and momentarily press the
start switch.
Water will begin flowing into
the tank. When water stops flowing into the tank,
initiate a second and a third brew cycle. During
this third brew cycle the tank will fill to its
capacity and the excess will flow from the spray-
head, out of the funnel, and into the decanter.
NOTE -
The On/Off brew station warmer switch must
be in the upper position to initiate and complete a
brew cycle.
6. Place the On/Off brew station warmer switch in
the lower position.
7. Disconnect the brewer from the power source.
8. Remove the front panel.
9. Rotate the control thermostat knob fully clock-
wise to the “ON” position and replace the front
panel.
10. Connect the brewer to the power source and wait
approximately twenty minutes for the water in the
tank to heat to the proper temperature. Some
water will drip from the funnel during this time;
this is due to expansion and should not occur
thereafter.
11. Place an empty decanter under the funnel.
12. Place the On/Off brew station warmer switch in
the upper position and momentarily press the
start switch. Empty the decanter after water has
stopped flowing from the funnel.
13. Allow the water in the tank to reheat to the proper
temperature.
14. Place an empty decanter on the warmer and press
the start switch. Check the water volume in the
decanter after water has stopped flowing from
the funnel. It should be 64 ounces.
15. If not, adjust the Timer as described in Adjusting
Brew Volumes (page 6)
16. Repeat steps 13-15 until 64 oz water volume is
achieved.
P1687
P1690
32440 070700
PLUMBING REQUIREMENTS (Cont.)
Plumbing Hook-Up
Model OT15 has an attached water strainer, proceed to step 2.
Models OT20, OT35, & RT35, proceed as follows:
1. Remove the rear panel and bottom pan. Run the long piece of tubing from the strainer (supplied) under the
brewer and attach it to the water inlet fitting on the solenoid. Reinstall the bottom pan and rear panel.
2. Flush the water line and securely attach it to the 1/4” flare fitting on the strainer.
3. Turn on the water supply.
INITIAL SETUP
CAUTION -
The brewer must be disconnected from the power source throughout the initial set-up, except when
specified in the instructions.
Part II
Содержание OL
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 27: ...Part I ...
Страница 38: ...SCHEMATIC WIRING DIAGRAM OT35B SW THERMOSTAT RED 0 BLK n I RED v U U I RED UPPER WARMER e Page30 Part I ...
Страница 48: ... BUNN HOUSINGS PANELS ModelOL OL RL OT RT _ b _ _ 16 15 14 RevisedDecemberl999 Part I ...
Страница 50: ... BUNN HOUSlNGS PANELS ModelRL D I a OL RL OT RT 2 P1649 6 RevisedDecember1999 Part I ...
Страница 54: ... BUNN HOUSlNGS PANELS ModelRT OL RL OT RT P1651 IO RevisedDecember1999 Part I ...
Страница 56: ...BUNN TANK COMPONENTS Models OL RL OL RL OT RT 9 i 17 18 19 24 20 26 P1652 RevisedDecemberl999 Part I ...
Страница 58: ...BUNN TANK COMPONENTS ModelsOL RL OL RL OT RT F Continued II PI 2 RevisedDecember1999 20 26 Pi 652 9 Part I ...
Страница 60: ...BUNN TANK COMPONENTS ModelsOT RT OL RL OT RT P1653 16 RevisedDecemberl999 Part I ...
Страница 62: ...BUNN STRAlNER ModelsOL RL OL RL OT RT 9 8 IO 7 P1654 18 RevisedDecember1999 Part I ...
Страница 68: ...BUNN WARMER ASSEMBLIES ModelsOL OT OL RL OT RT P1657 24 RevisedDecember1999 Part I ...
Страница 70: ...BUNN WARMER ASSEMBLIES ModelsRL RT OL RL OT RT I I 240V LOWER WARMERS 26 RevisedDecember1999 Part I ...
Страница 72: ......
Страница 73: ......
Страница 74: ...ELECTRICAL OPERATING CONTROLS ModelOL Continued OL RL OT RT 9 8 13 P1659 30 RevisedDecember1999 Part I ...
Страница 76: ...ELECTRICAL OPERATING CONTROLS ModelRL OL RL OT RT 32 RevisedDecember1999 Part I ...
Страница 78: ...Part I ...
Страница 80: ...J I BUNN ELECTRICAL OPERATlNGCONTROLS ModelOT OL RL OT RT 17 18 16 19 20 4 5 36 RevisedDecember1999 Part I ...
Страница 82: ...Part I ...
Страница 86: ...BUNN 8 FUNNELS BASKETS OL RL OT RT 47 RevisedDecember1999 Part I ...
Страница 90: ......
Страница 92: ......
Страница 170: ...44 BUNN OL RL OT RT FUNNELS BASKETS P1663 1 2 3 6 4 5 7 9 6 7 1 8 10785 010708 Part II ...
Страница 174: ......