Commissioning and maintenance instructions Logano GE434 Gas-fired special boiler • Issue 02/2003
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
8.8
Inspection and maintenance reports
The inspection and maintenance reports provide an
overview of the required inspection and maintenance
work.
Complete the reports during inspection and
maintenance. Sign all inspection work as completed
and enter the relevant date.
Inspection work
Page
Date
Date
1.
Check the general condition of the heating
system (visual and function check)
–
2.
Check the gas and water components of the
system for:
internal leaks
visible signs of corrosion
signs of ageing
3.
Check the heating system water pressure
4.
Check the air supply/ventilation and flue pipe
connections
5.
Check the gas supply pressure (flow
pressure)
––––––––––
mbar
––––––––––
mbar
6.
Check the nozzle pressure
––––––––––
mbar
––––––––––
mbar
7.
Check for leak during operation
8.
Record actual values:
Full load
Partial load
Full load
Partial load
Draught
––––––––––––
Pa
––––––––––––
Pa
––––––––––––
Pa
––––––––––––
Pa
Gross flue gas temperature t
A
––––––––––––
°C
––––––––––––
°C
––––––––––––
°C
––––––––––––
°C
Air temperature t
L
––––––––––––
°C
––––––––––––
°C
––––––––––––
°C
––––––––––––
°C
Net flue gas temperature t
A
– t
L
––––––––––––
°C
––––––––––––
°C
––––––––––––
°C
––––––––––––
°C
Carbon dioxide content (CO
2
)
or oxygen content (O
2
)
–––––––––––––
%
–––––––––––––
%
–––––––––––––
%
–––––––––––––
%
Flue gas losses q
A
–––––––––––––
%
–––––––––––––
%
–––––––––––––
%
–––––––––––––
%
Carbon monoxide content (CO), airless
–––––––––––
ppm
–––––––––––
ppm
–––––––––––
ppm
–––––––––––
ppm
9.
Function tests:
L.h.
R.h.
L.h.
R.h.
Test the high limit safety cut-out STB
Check ionisation current
– pilot burner function
–––––––––––––
µ
A
–––––––––––––
µ
A
–––––––––––––
µ
A
–––––––––––––
µ
A
– main burner function
–––––––––––––
µ
A
–––––––––––––
µ
A
–––––––––––––
µ
A
–––––––––––––
µ
A
Check the flue gas monitor
10.
Check the demand-dependent settings of
the control device (see control device
documentation)
–
11. Final checks of the inspection work
–
Confirm the professional commissioning
Company stamp/date/signature