6
Commissioning the heating system
Logano G115 WS US/CA – 6 720 813 418 (2019/09)
33
6.10
Commissioning log
▶ Initial and date the commissioning steps carried out.
Commissioning operations
Page
Readings taken
Comments
1.
Fill heating system and check for leaks
____________ psi
• Heating system pressure
2.
Bringing the system up to operating pressure
▶ bleeding heating system
▶ Testing relief valve
▶ adjust the expansion tank pressure (
see the expansion tank manufacturer’s
documentation)
____________ psi
3.
Checking combustion air supply and flue system
4.
Checking position of heat exchanger baffles
5.
Switching on the controls and burner (
controls' documentation)
6.
Checking flue gas temperature and raising if required
____________ °F
7.
Checking the manual reset high limit (STB)
8.
Adjusting the controls settings to suit the customer's requirements (
controls'
documentation)
9.
Informing the end user and handing over technical documentation
Confirmation of properly completed commissioning
Company stamp/signature/date
Inform the customer about the correct fuel and correct
operating pressure. Enter the details in the table
(
boiler operating instructions).