
Transporting and installing DHW tank
5
7
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logalux ST400/3, 500/3, 750/3 and 1000/3 "US" • Issue 07/2005
5
Transporting and installing DHW tank
5.1
DHW tank handling
Use suitable equipment to move the DHW tank. Secure
the DHW tank against slipping.
5.2
Positioning the DHW tank
The DHW tank may be placed either on the right or left
side of the boiler.
Observe the minimum clearances recommended for
installation and maintenance when installing the DHW
tank (Fig. 4). Maintain at least 6" clearance from
combustible surfaces.
The floor must be level and able to support a full tank.
Fig. 3
Moving DHW tank on pallet (general layout)
USER NOTE
z
Transport the DHW tank fastened to
the pallet on a transport dolly.
Fig. 4
Positioning the DHW tank (general layout)
(dimensions in inches)
CAUTION!
TANK DAMAGE
through frost.
z
The boiler room must be dry and safe
from the risk of frost.