3
Regulations
PW/P/PR/PNR/PNRZ... – 6 720 817 509 (2017/05)
39
3
Regulations
Observe the following directives and standards:
• Local regulations
•
EnEG
(in Germany)
•
EnEV
(in Germany)
Installation of, and equipment for, heating and water heating systems:
•
DIN
and
EN
standards
–
DIN 4753, part 1:
DHW cylinders and DHW heating systems for
potable and heating water; requirements, identification,
equipment and testing
–
DIN 4753, part 5:
Thermal insulation of DHW cylinders up to
1000 l nominal capacity – requirements and testing (product
standard)
–
DIN EN 12828:
Heating systems in buildings - Design for DHW
heating systems
–
DIN EN 12897:
Water supply – regulation for cylinder DHW
heaters (product standard)
–
DIN 18380:
VOB
1)
; heating systems and central water heating
systems
–
DIN 18381:
VOB
; gas, water, and waste water installation work
within buildings
–
VDE
regulations
4
Transport
A crane is appropriate for transport. Alternatively the cylinder can be
transported using a pallet truck or forklift truck (
5
assembly
▶ Check that the buffer cylinder is complete and undamaged.
5.1
Installation location
If there is a danger that water may collect on the floor of the installation
site:
▶ Position the buffer cylinder on a plinth.
▶ Site the buffer cylinder in dry, ventilated internal areas that are free
from the risk of frost.
▶ Observe the minimum room height (
page 67 and table 8, page 68) and minimum wall clearances
(
fig. 5, page 69) in the installation location.
5.2
Installing the temperature sensor
500 litre cylinder (
Assembly is also possible once the insulation has been installed.
▶ Observe the technical guide when positioning the sensor.
▶ Apply heat conducting paste to the contact surfaces.
▶ Insert the temperature sensor with installation set (part of the sensor
set) in the sensor pocket until it comes to a stop.
▶ Mark the temperature sensor leads at the end of each lead according
to sensor use.
▶ Route the sensor lead to the controller, ensuring it will be possible to
install the insulation.
▶ Electrical connection to the sensor leads. Observe the controller
installation instructions during this process.
750...1300 litre cylinder (
▶ Observe the technical guide when positioning the sensor.
▶ Apply heat conducting paste to the contact surfaces.
▶ Insert the temperature sensor into the spring clip so that the entire
length of the sensor surface makes contact with the storage cylinder.
▶ Mark the temperature sensor leads at the end of each lead according
to sensor use.
▶ Route the sensor lead to the controller, ensuring it will be possible to
install the insulation.
▶ Electrical connection to the sensor leads. Observe the controller
installation instructions during this process.
1) VOB: German contract construction procedures – Part C: General technical
specifications in construction contracts (ATV)
DANGER:
Risk to life through falling load.
▶ Only use lifting cables that are in a faultless condition.
▶ Only insert hooks into the lifting eyes provided.
Tilting danger with forklift trucks or pallet trucks.
WARNING:
Risk of injury through carrying heavy loads
and inadequately securing loads for transport!
▶
At least two
persons are required for transportation
and installation.
▶ Use suitable means of transport.
▶ Secure the buffer cylinder to prevent it falling.
Applies to 750...1300 litre cylinders:
▶ Remove the foil jacket and rigid foam shells before
transporting and store in a clean place.
NOTICE:
Risk of material damage from frost and corrosion.
▶ Site the buffer cylinder in a dry, frost-free room.
Содержание 7735500817
Страница 71: ...9 Onderhoud PW P PR PNR PNRZ 6 720 817 509 2017 05 71 9 10 11 12 ...
Страница 72: ...9 Onderhoud PW P PR PNR PNRZ 6 720 817 509 2017 05 72 13 14 15 16 6 720 817 501 07 1T 3 2 1 ...
Страница 74: ...9 Onderhoud PW P PR PNR PNRZ 6 720 817 509 2017 05 74 21 22 6 720 806 606 13 1ITL ...
Страница 75: ...9 Onderhoud PW P PR PNR PNRZ 6 720 817 509 2017 05 75 ...
Страница 76: ...Bosch Thermotechnik GmbH Sophienstrasse 30 32 D 35576 Wetzlar www buderus com ...