Actions
7
We reserve the right to make technical modifications
Buderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
53
box 138
z
Set multimeter to “measure resistance”.
z
Check the mains cable of the glow ignitor for breaks.
The electrical resistance measured at each individual wire
must be approximately 0
Ω
.
z
Check the mains cable of the glow ignitor for internal short
circuits. The level of electrical resistance, measured
between any two wires, must be infinitely high.
box 139
z
Connect the plug of the glow ignitor.
z
Fit the DBA control panel and place the boiler into
operation, see box 51, 54 or 55.
box 140 Replace the glow ignitor
H
DANGER OF FATAL ACCIDENT
due to electric shock
z
Take the boiler out of operation, see box 43, 44 or 47.
z
Remove the plug of the glow ignitor, see box 131.
box 141
z
Loosen the fixing nut of the glow ignitor (item 1).
z
Remove the mounting plate (item 2).
z
Detach the glow ignitor (item 3).
1
JP1
6
1
2
3
box 142
A
CAUTION!
The filament of the glow ignitor consists of sintered
material and is highly breakable.
z
Fit a new glow ignitor.
z
Connect the plug of the glow ignitor.
z
Put the boiler into operation, see box 51, 54 or 55.
box 143 Measure the ionisation current
z
Take the boiler out of operation, see box 43, 44 or 47.
box 144
z
Pull out the ionisation electrode plug (item 1).
box 145
z
Use a multimeter that is specially designed to measure the
ionisation current.
1