Actions
7
We reserve the right to make technical modifications
Buderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
47
box 98
z
Loosen the four Allen screws on the pump.
z
Remove the top section of the pump.
box 99
z
Clean the pump impeller wheel.
box 100
z
Refit the top section of the pump.
z
Fill and vent the heating system, see box 52 to 58.
z
Fit casing, see box 51.
box 101 Replace the pump
H
DANGER OF FATAL ACCIDENT
due to electric shock
z
Take the boiler out of operation and drain the heating
system, see box 43, 44, 47, 45, 49 or 50.
z
Remove the power supply plug of the pump, see box 92.
box 102
z
Loosen the union nuts (item 1) at the top and side of the
pump.
z
Remove the pump.
box 103
A
CAUTION!
Fit new flat sealing rings when installing the new pump.
z
Install the new pump.
z
Insert the power supply plug of the pump, fill and vent the
heating system of air and put the boiler into operation,
see box 57 to 60.
z
Fit casing, see box 51.
box 104 Check the flow, safety and DHW temp. sensors
(applies to external cylinder only)
z
Put the boiler into operation, see box 54 or 55.
z
Open the hot water tap and wait for the boiler to start up,
then gradually close the hot water tap to bring the CH flow
temperature to over 80 °C.
z
Take the boiler out of operation and remove the casing,
see box 43, 44 or 47.
1
1