Actions
7
We reserve the right to make technical modifications
Buderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
41
box 61
z
Press the menu button (item 1) on the DBA control panel
of the boiler.
z
Configure the menu as required, see box 14.
box 62
Check/replace fuses (1)
H
DANGER OF FATAL ACCIDENT
due to electric shock
z
Take the boiler out of operation, see box 43, 44 or 47.
box 63
z
Remove the casing from the boiler, see box 47.
z
Loosen the cap screw on the DBA control panel (item 1).
z
Tip the DBA control panel forwards (item 2).
1
1
2
box 64
z
Remove the rear section of the DBA control panel,
see box 70.
z
Remove the fuse from the fuse holder.
z
Check the fuse with a multimeter. If the fuse possesses
infinitely high electrical resistance, it is defective.
z
Replace the defective fuse with a (new) 2.5 AT slow blow
reserve fuse.
box 65
z
Refit the DBA control panel, following the above
procedure in reverse order.
z
Refit the casing and place the boiler into operation,
box 66
Check fan – activation 230V AC
H
DANGER OF FATAL ACCIDENT
due to electric shock
A
CAUTION!
To prevent damage, do not insert the measuring
electrodes of the multimeter too far into the holes of the
plug-and-socket connection.
z
Remove the casing and place the boiler out of operation,
see box 47, 43 or 44.