BÜCHI Labortechnik AG
Installation | 5
Operation Manual SyncorePlus
21/56
NOTICE
Risk of property damage and diminished performance due to use of un-
suitable power cables.
The power supply cables supplied with the product by BUCHI precisely match the re-
quirements of the device. If other power cables that do not meet those requirements
are used, the device may be damaged and/or its performance diminished.
u
Use only the power supply cables supplied with the product or ordered separately
from BUCHI.
u
If using any other power supply cables, make sure that they match the specifica-
tions on the type plate.
u
Make sure that all connected devices are earthed.
u
Plug the power cable into the connection on the instrument. See Chapter 3.2
"Configuration", page 14
u
Plug the mains plug into the mains outlet socket.
5.4
Securing against earthquakes
NOTE
4
Eye screw M10 x 10.
4
Screw-in depth 10 mm.
NOTE
Choose the tap hole according to your installation.
Position tap hole see Chapter 3.2 "Configuration", page 14
u
Attach the eye screws to the instrument.
u
Attach the instrument to a fixed point using a
strong cord or a wire.
5.5
Connecting the instrument to the control system
NOTE
Using the control system. See operation manual
"Interface I-300 Pro "
.
5.6
Installing the condenser
NOTE
Choose the tap hole according to your installation.