5 Putting into operation
21
K-425 / K-436
Operation Manual, Version B
5
Putting into operation
This chapter describes how the instrument has to be installed. It also gives instructions for the initial
startup.
Note
Inspect the instrument for damage during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company. Keep the original
packaging for future transportation.
5 .1
Installation site
Put the instrument into a fume hood onto a clean, stable and horizontal surface. Consider the
maximum product dimensions and weight. Obtain the environmental conditions as described in
section 3.2, technical data.
Installation prerequisites and installation steps:
• The fume hood must be equipped with a heat- and acid-resistant lining.
• Do not place any objects on top or below the instrument.
• The instrument must be installed with a safety clearance of not less than 5 cm to any other
objects or walls to allow sufficient cooling.
• Do not place containers, chemicals or other items behind the instrument.
• When using a Scrubber B-414 it must be placed on the
left
side of the SpeedDigester.
Note
• T o cut the power in case of an emergency by unplugging, the instruments or any other items
must not block the mains plug!
• Any
cooling of the SpeedDigester can disturb the digestion
process. When switched 'On',
the Scrubber
B-414 cooling fan emits from the left side of the
housing. Hence the Scrubber B-414
should not be installed on the
right
side of the SpeedDigester.
!
DANGER
Death or serious injuries by use in explosive environments.
• Do not store or operate the instrument in explosive environments
• Do not store chemicals in the vicinity of the device
• Operate the device in a fume hood with sufficient ventilation to directly withdraw fumes
Содержание SpeedDigester K-425
Страница 1: ...K 425 K 436 SpeedDigester Operation Manual 11593346B en...
Страница 56: ......
Страница 57: ......