5 Putting into operation
27
K-415 Operation Manual, Version B
native to the receiving vessel. For details please refer to chapter 5.5.
The connections of the condenser can be seen from the following schema:
4
1
2
3
a
Cooling water outlet
b
Connection to neutralization stage
c
Fume inlet (connection to emission source / digester)
d
Cooling water inlet
Fig. 5.7:
Connections of the condenser
5 .4
Installing the Reaction vessel
• Screw the screw cap
c
together with the gasket ring
b
loosely onto the reaction vessel
a
.
• Insert the introduction tube assembly
d
. Tighten the screw cap
c
.
• Insert the mounted reaction vessel
a
from the side to the housing and place it in the groove
i
on the bottom of the housing (the introduction tube assembly
d
has to protrude from the round
opening on top of the housing
j
).
• Attach the provided tubing
g
and
h
using the provided screw caps
f
and gaskets
e
(GL 14).
(See also chapter 5.7.4)
• (Dismount in the reversed order.)
1
4
9
10
Fig. 5.8 Installing the Reaction vessel
1
2
3
4
5
6
7
5
6
8
Содержание Scrubber K-415
Страница 1: ...Scrubber K 415 Operation Manual 11593505 en ...
Страница 5: ...1 About this manual 4 K 415 Operation Manual Version B ...
Страница 7: ...2 Safety 6 K 415 Operation Manual Version B ...
Страница 13: ...3 Technical data 12 K 415 Operation Manual Version B ...
Страница 19: ...4 Description of function 18 K 415 Operation Manual Version B ...
Страница 23: ...5 Putting into operation 22 K 415 Operation Manual Version B ...
Страница 39: ...6 Operation 38 K 415 Operation Manual Version B ...
Страница 49: ...9 Shutdown storage transport and disposal 48 K 415 Operation Manual Version B ...
Страница 51: ...10 Spare parts 50 K 415 Operation Manual Version B ...
Страница 55: ...11 Declarations and requirements 54 K 415 Operation Manual Version B ...
Страница 57: ...11 2 Declaration of conformity ...