BÜCHI Labortechnik AG
Installation | 5
Operation Manual Rotavapor® R-300
41/116
Rotavapor
1
Fig. 22: Power supply connection on Rotavapor R-300
1
Power supply connection
NOTE
When connecting the Rotavapor and the heating bath to the power supply, it is
important to ensure that they are grounded. The use of 3-core power cables and
3-pin plugs will ensure that is the case.
u
Make sure that the available power supply matches the rating indicated on the
type plate.
u
Plug the power cord into the socket (1) on the Rotavapor and then into a mains
power socket.
u
If an extension lead is required, make sure that it is grounded and has a suitable
power rating.
Heating bath base
2
1
Fig. 23: Power supply connection on heating bath base
1
Fuse rating plate
2
Power supply connection