5 | Installation
BÜCHI Labortechnik AG
24/116
Operation Manual Rotavapor® R-300
The Heating Bath B-300 Base can also be secured against earthquakes in similar
fashion by fitting a lashing eye on the underneath.
5.3
Fitting the vapor duct, vacuum gasket and cooling condenser
u
Insert vapor duct into the rotary drive unit.
ð
The vapor duct snaps into place with an audi-
ble click.
u
Pull on the vapor duct to check that it is properly
engaged and cannot be pulled out without resis-
tance.
R
The adapter is in the sealing.
u
Place the sealing with the inserted adapter on the
vapor duct
u
Press the sealing evenly into the flange.
1
Adapter
2
Sealing VS26
3
Vapor duct
3
2
1
NOTICE! The adapter is needed for every installa-
tion of the sealing.
u
Remove the adapter.
u
Keep the adapter for later use.
u
Tighten the flange nut to fix the cooling condenser
in position. When doing so, make sure that the
spring clip in the flange nut completely encircles
the neck of the cooling condenser.