Büchi Labortechnik AG
Installation | 5
Operation Manual NIRMaster™
21/46
5
Installation
5.1
Before installation
NOTICE
Instrument damage due to switching it on too early.
Switching on the instrument too early after transportation can cause damage.
u
Climatize the instrument after transportation.
5.1.1
Electrical connections requirement
NOTICE
For safe servicing the instrument it needs to be disconnect from the mains power
supply.
Precondition:
R
The instrument is installed with a locked or secured plug.
R
The instrument is installed stationary (without power plug).
u
An external power switch is required.
5.2
Establishing electrical connections
NOTICE
Risk of instrument damage because of not suitable power supply cables.
Not suitable power supply cables can cause bad performance or an instrument
damage
u
Use only BUCHI power supply cables.
Precondition:
R
The electrical installation is as specified on the
type plate.
R
The electrical installation is equipped with a
proper grounding system.
R
The electrical installation is equipped with
suitable fuses and electrical safety features.
R
The installation site is as specified in the
technical date. See Chapter 3.6 "Technical
data", page 15
u
Connect the power supply cable to the
connection on the instrument. See Chapter 3.3
"Configuration", page 14
Содержание NIRMaster Essential
Страница 1: ...NIRMaster Operation Manual 11593580 E en ...
Страница 45: ......