background image

NIR-Online GmbH

Installation | 5

Operation Manual Process Analyser PA2

27/36

The power supply must fulfil the following conditions:

1. Provide the specified mains voltage and frequency.

2. Be designed for the load imposed by the instruments connected.

3. Be equipped with suitable fuses and electrical safety devices.

4. Be equipped with proper grounding.

NOTICE

Risk of property damage and diminished performance due to use of un-
suitable power cables.

The power supply cables supplied with the product precisely match the requirements
of the instrument. If other power cables that do not meet those requirements are
used, the product may be damaged and/or its performance diminished.

u

Use only the power supply cables supplied with the product or ordered separately
from the manufacturer.

u

If using any other power supply cables, make sure that they match the specifica-
tions on the type plate.

Содержание NIR-Online PA2

Страница 1: ...NIR Online Process Analyser PA2 Operation Manual 11594012 C en...

Страница 2: ...the right to make changes to this manual as required on the basis of future insights especially with respect to layout illustrations and technical detail This manual is copyright Information from it...

Страница 3: ...2 9 Modifications 9 3 Product description 11 3 1 Description of function 11 3 2 Configuration 11 3 2 1 Front view 11 3 2 2 Rear view 12 3 3 Type plate 12 3 4 ATEX rating 14 3 5 Scope of delivery 14 3...

Страница 4: ...erence data in the journal 28 7 Cleaning and servicing 29 7 1 Regular maintenance work 29 8 Taking out of service and disposal 30 8 1 Disposal 30 8 2 Returning the instrument 30 9 Appendix 31 9 1 Cert...

Страница 5: ...vice nir online buchi com 1 1 Warning notices in this document Warning notices warn you of dangers that can occur when handling the device There are four danger levels each identifiable by the signal...

Страница 6: ...ter indicates an instruction that must be carried out by the user This character indicates the result of a correctly carried out instruction Mark up Explanation Window Software Windows are marked up l...

Страница 7: ...omply with the technical specifications see Chapter 3 6 Technical data page 15 constitutes use other than that in tended In particular the following applications are not permissible Using the sensor i...

Страница 8: ...ks The device has been developed and manufactured using the latest technological ad vances Nevertheless risks to persons property or the environment can arise if the device is used incorrectly Appropr...

Страница 9: ...afety related incidents that occur while operating the instrument are to be re ported to the manufacturer service nir online buchi com NIR Online service technicians Service technicians authorized by...

Страница 10: ...2 Safety NIR Online GmbH 10 36 Operation Manual Process Analyser PA2 NIR Online GmbH accepts no liability whatsoever for damage arising as a result of unauthorized modifications...

Страница 11: ...optics that direct the light to the NIR and visible spectrophotometers respectively The visible spectrophotometer consists of a diffraction grating to spatially disperse the light ac cording to wavel...

Страница 12: ...view 1 Coolant connection 2 Coolant connection 3 Thermostat make switch 4 Beacon 5 Button 6 Type plate 7 Video connection 8 Ground connection Equipotential bonding 9 Device cable connection 3 3 Type p...

Страница 13: ...on maximum 10 Ambient temperature 11 Current draw maximum 12 ATEX certification number 13 Certification center number 14 Certificates 15 Operating voltage 16 Product type 17 Product option The followi...

Страница 14: ...Union ATEX Directive rat ings II 2 D Ex tb op is Da IIIC T100 C Db Meaning of the rating marks Rating Meaning according to Directive 2014 34 EU II Device group approved for all Ex zones except mining...

Страница 15: ...ter cooling 10 C to 40 C Vibrations 0 2 G at 0 1 150 Hz Wavelength spectrum 400 2200 nm Detector Diode array Average measurement time 5 spectra s Protection class IP66 Lamp type Tungsten halogen lamp...

Страница 16: ...rd disk suitable for continuous operation Data backup Network or external hard disk At least 0 5 GB free disk space Additional 20 MB per day and sensor Screen resolution At least 1280x1024 LAN At leas...

Страница 17: ...When used SX Center User interface Selection of measurement method Users Daily workflow Viewing mea surement re sults Entry of refer ence data SX Backup Data backup planner Automatic backup of measur...

Страница 18: ...ideally in the original box u Avoid sharp movements during transit u After transportation check the device for damage u Damage that has occurred in transit should be reported to the carrier u Keep pa...

Страница 19: ...as direct sunlight The layer thickness of the product to be measured is at least 30 mm A constant product flow is ensured The product flow can be directly measured There is a sample removal point at a...

Страница 20: ...Online GmbH 20 36 Operation Manual Process Analyser PA2 5 3 Installation point in piping system example 1 m 1 2 3 4 5 Fig 5 Configuration 1 Flow restrictor 2 Bypass 3 Analyser 4 Sample removal point...

Страница 21: ...sors per computer up to 2 sensors with CCD camera per computer Process control system SX Client Display Results Charts Chemometric software manual calibration SX Plus Remote access via Ethernet Video...

Страница 22: ...140 Fig 6 Dimensions of flange 5 6 Sensor installation DANGER Use of an unsuitable flange in potentially explosive atmospheres The use of an unsuitable flange may cause an explosion u In potentially...

Страница 23: ...Establishing installation point page 21 R The fixing points or bolts conform to M6 A2 70 15 mm u Fix the sensor to the installation point using the bolts 5 7 Connecting the sensor Tools required Torqu...

Страница 24: ...Process Analyser PA2 u Slide the cable guard over the con nector u Plug the connector into the sensor u Secure the connector Tightening torque 2 5 Nm 0 5 u Fix the cable guard to the sensor Tightening...

Страница 25: ...Process Analyser PA2 25 36 5 8 Connecting the video cable optional accessory Socket 7 mm u Slide the cable guard over the video cable connector u Plug the connector into the sensor Tightening torque...

Страница 26: ...stablishing the electrical connection to the installation box WARNING Death or serious burns by electric current u Have the installation carried out by an electrician or a person with similar expert k...

Страница 27: ...ding NOTICE Risk of property damage and diminished performance due to use of un suitable power cables The power supply cables supplied with the product precisely match the requirements of the instrume...

Страница 28: ...alibration reference data is re quired Continuous checking of the calibration is performed according to the requirements of the production process NOTE The journal entry is identified by date and time...

Страница 29: ...mables and spare parts in order to ensure cor rect operation of the device and preserve the warranty 7 1 Regular maintenance work Component Action Interval Casing u Wipe down the casing with a damp cl...

Страница 30: ...of the instrument u When disposing of equipment observe the local regulations and statutory require ments regarding waste disposal u When disposing observe the disposal regulations of the materials u...

Страница 31: ...NIR Online GmbH Appendix 9 Operation Manual Process Analyser PA2 31 36 9 Appendix 9 1 Certificates 9 1 1 CE certificate...

Страница 32: ...3OlEU EMC directive 2Ol4l34lEU ATEX directive and are in accordance with the following standards und den folgenden Normen entsprechen ainsi qu aux normes suivantes ed sono conformi ai seguenti standar...

Страница 33: ...PC video card Frame grabber PCI High Profile 11063017 Profibus card PCI High Profile 11060743 Profibus card PCI Low Profile 11062589 Profibus card PCI Express High Profile 11063000 Profibus card PCI E...

Страница 34: ...10 m Pin assignment on device connector viewed from rear of instrument Fig 8 Pin assignment 1 PIN 1 blue ground 2 PIN 2 red 12 7 VDC 3 PIN 3 green RxD 4 PIN 4 yellow TxD 5 PIN 5 white TxD 6 PIN 6 brow...

Страница 35: ......

Страница 36: ...n zh India BUCHI India Private Ltd IN Mumbai 400 055 T 91 22 667 75400 F 91 22 667 18986 india buchi com www buchi com in en Indonesia PT BUCHI Indonesia ID Tangerang 15321 T 62 21 537 62 16 F 62 21 5...

Отзывы: