5 | Installation
NIR-Online GmbH
26/36
Operation Manual Process Analyser PA2
5.9
Connecting the thermostat
u
Screw the thermostat onto the
bracket.
5.10
Connecting the coolant
NOTE
The coolant supply is within the specified parameters. See Chapter 3.6 "Technical
data", page 15
u
Connect the coolant supply to the
condenser.
5.11
Establishing the electrical connection to the installation box
WARNING
Death or serious burns by electric current.
u
Have the installation carried out by an electrician or a person with similar expert
knowledge.
u
After installation, check electrical safety.
NOTE
Observe the legal requirements when connecting the instrument to the power supply.
4
Use additional electrical safety features (e.g., residual-current circuit breakers) to
comply with local laws and regulations.
4
Perform installation in accordance with IEC/EN 60079-14.
Содержание NIR-Online PA2
Страница 1: ...NIR Online Process Analyser PA2 Operation Manual 11594012 C en...
Страница 35: ......