NIR-Online GmbH
Installation | 5
Operation Manual Process Analyser PA2
19/36
5
Installation
5.1
Installation site (production)
Make sure that the installation site meets the following requirements:
Minimum space requirements: 250 mm x 300 mm x 270 mm (W x D x H).
At least 300 mm clearance on all sides. The clearance ensures air circulation and
prevents the instrument from overheating.
The installation point meets the specifications. See Chapter 5.5 "Establishing in-
stallation point", page 21.
The sensor is not exposed to any external sources of heat such as direct sunlight.
The layer thickness of the product to be measured is at least 30 mm.
A constant product flow is ensured.
The product flow can be directly measured.
There is a sample removal point at a distance of < 1 m.
5.2
Installation site (laboratory)
Make sure that the installation site meets the following requirements:
Firm, level surface.
Minimum space requirements: 250 mm x 300 mm x 270 mm (W x D x H).
Take into account the maximum product dimensions and weight.
At least 300 mm clearance on all sides. The clearance ensures air circulation and
prevents the sensor from overheating.
The sensor is not exposed to any external sources of heat such as direct sunlight
NOTE
Make sure that the power supply can be disconnected at any time in an emergency.