8 | Operating top-mount drying racks
Büchi Labortechnik AG
72/100
Operation Manual Lyovapor™ L-200/L-200 Pro
8.2
Operating manifold acrylic drying chamber (heatable shelves)
u
Make sure that the groove above the ice
condenser is clean, free of dust and not
scratched.
u
Check the 300 mm dia. O-ring for damage.
u
Place the 300 mm dia. O-ring in the groove
above the ice condenser.
u
Place the intermediate plate on the ice
condenser.
u
Loosen all fixing screws.
u
Align the slots for the shelves.
u
Tighten the fixing screws.