7 | Operating Pro control panel
Büchi Labortechnik AG
68/100
Operation Manual Lyovapor™ L-200/L-200 Pro
NOTICE
Do not use force to remove the ice from the ice condenser.
Navigation path
➔
Start
Precondition:
R
The freeze-drying process has ended.
u
Position the condensate drain hose so that the condensate can be drained off.
See Chapter 5.3.9 "Preparing the condensate drain hose", page 30
u
Navigate to the
[Start]
menu via the navigation path.
u
Tap the function
[Shut down]
on the function bar.
ð
The instrument is shutting down.
ð
The status bar shows the remaining time and the status Defrosting.
ð
After the instrument has shut down, the status bar shows the remaining time
and the status Shutting down.
u
Put hot water on ice condenser coil for defrosting.
u
Wait until ice is completely removed.
7.10.5 Switching off the instrument
Precondition:
R
The instrument has been shut down. See Shutting down the instrument
u
Switch the On/Off master switch to Off.