11
Digestion Unit
K-424
5 Operation
5.4
Carrying out the Kjeldahl digestion
•
Switch the unit on
and preheat for approx. 5 minutes
on stage 10.
•
Wear protective goggles!
•
Place the digestion tubes in the digestion tube holder
on the rack
.
•
Introduce the sample and reagents into the digestion
tubes
.
•
Seal off unused connecting branches with the glass
cap (item No. 17396) .
Never install empty digestion tubes!
•
Place the suction module
with the fitted gaskets on
the digestion tube holder.
•
Turn on scrubber or water jet pump bevor any gases
can develop.
5.5
Malfunctions
Malfunction
Possible cause
Remedy
Heating elements do not
1. Mains plug not plugged in
- Connect unit to the mains
heat up
2. Unit switched OFF
- Switch ON
3. Energy regulator in position „0“
- Set to position "10"
4. Energy regulator faulty
- Replace regulator
5. Heating elements faulty
- Replace heating element
Lamp does not light up (H 1)
Lamp faulty
Replace lamp
Table 4: Malfunctions
Fig. 10: Operation of the K-424
Содержание K-424
Страница 1: ......
Страница 2: ......
Страница 21: ...19 Digestion Unit K 424 9 4 Declaration of confomity 9 Appendix...