5 Putting into operation
19
K-350
Operation Manual, Version G
5
Putting into operation
This chapter describes how the instrument is installed and gives instructions on initial startup.
NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company.
Keep the original packaging for future transportation.
5 .1
Installation site
Install the instrument on a clean, flat and stable base and place the storage tanks on the same level as
the instrument (not higher and not more than 1 m lower).
ATTENTION
To ensure the instrument safety do not place any object on top of it.
ATTENTION
For safety reasons, make sure that the distance between the instrument and another object or a wall
is at least 30 cm.
ATTENTION
For safety reasons do not place any containers, chemicals or other instruments behind the instru-
ment.
5 .2
Electrical connections
Fig. 5.1: Electrical connections
Содержание K-350
Страница 1: ...K 350 Distillation Unit Operation Manual 093031G en...
Страница 34: ......
Страница 35: ......