Büchi Labortechnik AG
Installation | 5
Operation Manual Inert Loop S-395
17/34
5
Installation
5.1
Before installation
NOTICE
Instrument damaged if switched on too early.
After transporting, wait twelve hours before switching on the instrument. The fluid
in the cooling system requires twelve hours to collect in the refrigerant compressor.
5.2
Establishing electrical connections
NOTICE
Risk of instrument damage because of not suitable power supply cables.
Not suitable power supply cables can cause bad performance or an instrument
damage
u
Use only BUCHI power supply cables.
Precondition:
R
The electrical installation is as specified on the
type plate.
R
The electrical installation is equipped with a
proper grounding system.
R
The electrical installation is equipped with
suitable fuses and electrical safety features.
R
The installation site is as specified in the
technical date. See Chapter 3.4 "Technical
data", page 12
u
Connect the power supply cable to the
connection on the instrument. See Chapter 3.2
"Configuration", page 10
u
Connect the mains plug to an own mains outlet
socket.
5.3
Installing the exhaust gas hose
CAUTION
Risk of overpressure due to clogged exhaust.
Overpressure can damage the instrument or impact the safety of the user.
u
Do not bend, fold or squeeze tubes that are connected to the exhaust.