
BÜCHI Labortechnik AG
Installation | 5
Operation Manual FatExtractor E-500
33/88
u
Turn the extraction glass chamber 45° coun-
terclockwise.
u
Make sure that the extraction glass chamber
locks at the hook.
u
Connect the valve with the sensor plug on the
installation board.
u
Push the chamber rack in the instrument.
5.10
Preparing the instrument for Hot Extraction
5.10.1
Installations for Hot Extraction
u
Prepare the condenser. See Chapter 5.13 "Preparing the condenser",
page 36
u
Install the protection shields. See Chapter 5.12.2 "Installing one protec-
tion shield (Hot and Economic Continuous Extraction only)", page 36
u