5 Putting into operation
17
C-660 Operation Manual, Version F
3
6
7
8
The collector head e is found on the collec-
tor arm
h
of the fraction collector. Clamp the
tubing guide
f
(metal pipe) tightly into the
collector head
g
.
Ensure that the height of the tubing guide
f
is correct. It should be at least 1 cm above the
tube rim, so that it will not damage the tubing
during operation.
Now direct the FEP-tubing
c
from valve out-
let
b
and afterwards through the tubing guide
f
, so that it pokes out approximately 3 mm.
Connect the valve to the WASTE VALVE con-
nection
i
.
9
Fig. 5.3: Installating the waste diverter valve
2 3 4
1
8
5
6
7
9 10
Fig. 5.4: Control arrangement on the Pump Controller
a
Power cord
b
FUSE 0.5 AT: Fuse
c
WASTE VALVE: Valve control
d
WASTE LEVEL: Monitoring of valve bottle
level
e
TTL IN/OUT: TTL connection
f
DETECTOR IN 1,2: Detector inputs 1 + 2
g
X-T RECORDER 1,2: Chart recorder outlets
1 + 2
h
RS 232: Series data interfaces
i
RS 485: 2× bus interface for peripheral
devices (fraction collector, pumps, etc.)
j
Address bus switch for remote control
position 1 or 2 for SepacoreControl,
position 0 for manual mode