5  Putting into operation

32

R-210/215 Operation Manual, Version F

Putting into operation

This chapter describes how the instrument is installed and gives instructions on initial startup.

NOTE

Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company.

Keep the original packaging for future transportation.

5 .1 

Installation site

Place the instrument on a stable, horizontal plane and consider the maximum product dimensions.
Perform the distillations under vacuum with the Rotavapor placed under a fume hood. If this is not 
possible due to shortage of space, mount the protective shield (optional accessory) and lead the 
exhaust gas from the pump into the fume hood.

5 .2 

Electrical connections

ATTENTION

Make sure that the voltage on the socket corresponds to the voltage given on the type plate of the 
instrument.

Always connect the instrument to an earthed socket. External connections and extension cables 
must be provided with an earthed conductor lead (3-pole couplings, cable or plug equipment) as the 
mains lead has a molded plug, thus avoiding risks due to inadvertent defective wiring.

Make sure that no electric sparks form in the instrument or its surroundings as they might damage 
the instrument.

5 .3 

Commissioning the heating bath

Place the bath on the base plate of the Rotavapor.

If you need to adjust the position of the bath, lift 
it up slightly at the right-hand side and pull or 
push it to the desired position.

Fig. 5.1: Moving the heating bath