5 | Installation
BÜCHI Labortechnik AG
20/38
Operation Manual Inert Loop B-295 SE
u
Remove the foil from the oxygen sensor.
u
Install the new oxygen sensor.
u
Connect the sensor cable.
u
Calibrate the sensor. See Chapter 8.1 "Cali-
brating the oxygen analyzer", page 29
u
Install the grounding cable.
u
Install the front cover
5.5
Connecting the Inert Loop B-295 SE with a spray drying system
u
Connect the communication cable to the spray
dryer.
Connection at the spray dryer see related opera-
tion manual.
Содержание B-295 SE
Страница 1: ...Inert Loop B 295 SE Operation Manual STOP START 11594141 B en...
Страница 37: ......