BÜCHI Labortechnik AG
Installation | 5
Operation Manual Ultrasonic Package
21/34
u
Attach the drying gas hose to the inert gas
adapter
u
Attach the inert gas hose to the inert gas
adapter.
u
Install the inert gas hose onto the connection
marked
OUT
.
u
Attach the inert gas hose in place with the
union nut.
Содержание 11069891
Страница 1: ...Ultrasonic Package Operation Manual 11594107 A en...
Страница 33: ......