5 | Installation
BÜCHI Labortechnik AG
20/34
Operation Manual Ultrasonic Package
u
Attach the assembled feeding tube to the noz-
zle.
u
Attach the inlet tube in place with the union
nut.
u
Install the feed tube at the peristaltic pump.
See operation manual Mini Spray Dryer
B-290.
u
Adjust the peristaltic pump bed. See
"Opera-
tion Manual Mini Spray Dryer B-290 "
u
Cut the drying gas hose 200 mm below the
heater.
u
Attach the hose connector to the inert gas
adapter.
u
Attach the inert gas connector to the hose.
u
Attach the inert gas adapter in place with a
hose clip.
Содержание 11069891
Страница 1: ...Ultrasonic Package Operation Manual 11594107 A en...
Страница 33: ......