BTCPower EVSE 200 KW Скачать руководство пользователя страница 5

This document is the 

Property of Broadband Telecom Power Inc.

 and 

will not be copied, reproduced, or used as the basis for sale or 

manufacture of apparatus without written permission.

 

BTCPower 200 KW EVSE Installation manual 

Rev K 

Page  5 of 26

 

 

 

WARNING 

 

If your supply cable is somehow damaged do not operate your charge station.  Contact your service 

representative for service immediately.  Shut down the power to the unit by switching the breaker on 

the supply panel to the off position.  

 

2.

 

Installation

 

 

Safety instructions 

 

The  EVSE  (Electric  vehicle  supply  equipment)  should  be  installed  by  a  qualified  electrician  in 

accordance with local codes and all applicable ordinances 

 

The  charging  station  is  required  to  be  connected  to  a  ground,  metal,  permanent  wiring  system.  

Connections to the charge station should comply with all local codes and ordinances.  

 

Read all installations instructions carefully prior to performing the installation.  

 

WARNING: 

 

This device utilizes high voltages do not attempt to install this equipment if you are not a qualified 

electrician.  

 

 

2.1 ADA Consideration 

 

 

STANDARDS FOR ACCESSIBLE DESIGN for Americans with Disabilities is applicable when choosing the location and 
placement of all Electric Vehicle Supply Equipment. The following is a direct excerpt from the 2010 ADA Standards for 
Accessible Design:

 

http://www.ada.gov/2010ADAstandards_index.htm

 

The Department of Justice published revised regulations for Titles II and III of the Americans with Disabilities Act of 

1990 

ADA

 in the Federal Register on September 15, 2010. These regulations adopted revised, enforceable 

accessibility standards called the 2010 ADA Standards for Accessible Design 

2010 Standards

 or 

Standards

. The 

2010 Standards set minimum requirements 

 both scoping and technical -- for newly designed and constructed or 

altered State and local government facilities, public accommodations, and commercial facilities to be readily accessible 
to and usable by individuals with disabilities. 

 

Adoption of the 2010 Standards also establishes a revised reference point for Title II entities that choose to make 
structural changes to existing facilities to meet their program accessibility requirements; and it establishes a similar 
reference for Title III entities undertaking readily achievable barrier removal. 

 

The Department has assembled this online version of the official 2010 Standards to increase its ease of use. This 
version includes: 

 

2010 Standards for State and Local Government Facilities Title II 

 

2010 Standards for Public Accommodations and Commercial Facilities Title III 

 

 

 

The Department has assembled into a separate publication the revised regulation guidance that applies to the 
Standards. The Department included guidance in its revised ADA regulations published on September 15, 2010. This 

Содержание EVSE 200 KW

Страница 1: ...r opening 7 Conduit windows 8 Changed dispenser auxiliary to 120 VAC single phase Cortes C 1 29 2017 1003 1 Added three dispenser 50 KW configuration Cortes D 1 30 2018 1004 1 Added 50 KW auxiliary po...

Страница 2: ...r sale or manufacture of apparatus without written permission BTCPower 200 KW EVSE Installation manual Rev K Page 2 of 26 200 KW EVSE CHARGER 2 Cold weather heater integrated Auxiliary power added for...

Страница 3: ...allation Line Drawing 200 KW Configuration 21 9 Installation Line Drawing 50 KW Configuration 22 10 Dispenser Template 23 11 Power Conversion Tower Template 24 12 Maintenance 25 a Maintenance Precauti...

Страница 4: ...ation guidelines IMPORTANT SAFETY INSTRUCTIONS The following symbols may be found in your handbook or on labels affixed to your conductive charge station DANGER Danger indicates a hazard or unsafe pra...

Страница 5: ...tandards for Accessible Design http www ada gov 2010ADAstandards_index htm The Department of Justice published revised regulations for Titles II and III of the Americans with Disabilities Act of 1990...

Страница 6: ...ons please visit the Department s website www ADA gov or for answers to specific questions call the toll free ADA Information Line at 800 514 0301 Voice or 800 514 0383 TTY 2 2 Equipment Description W...

Страница 7: ...power module 2 7 Output Contactors power module 3 8 Output Contactors power module 4 9 Air Cooling Vent 10 Master Controller 11 Safety Relays 12 24vdc Power Supply 13 5 12 15 15 vdc Power Supply 200...

Страница 8: ...Box Quad output SCCR 65 KA EVPC 200 4 480 3 65 PC200465 7 DCFC Dispenser CCS CHAdeMO EVDSP 350 5 120 0 2 C 4 0 DSP3505CHACCS 8 DCFC Dispenser Dual CCS EVDSP 350 3 120 0 2 C 4 0 DSP35032XCCS 9 DCFC Dis...

Страница 9: ...liary power 120 VAC Single phase 20 Amps Both CHAdeMO CCS and CCS CCS models Connectors available CCS only HPC CCS Huber Suhner Connectors available CHAdeMO only SEI Sumitomo Electric 200 Amp Continuo...

Страница 10: ...eter Specification Specification Input Voltage Range 480 VAC three phases 10 10 480 VAC three phases 10 10 Input Current 480 VAC 240 Amps 240 Amps Frequency 47 63 Hz for three phase inputs 47 63 Hz fo...

Страница 11: ...Power 50 KW per output 4 simultaneous up to 200 KW Max Output Current 125 Amps per output Minimum Current In current mode 5 Amps Enclosure IK rating IK 08 Enclosure IP rating IP 54 Total Harmonic Dist...

Страница 12: ...r UL 2231 EMC requirements 6 KV requirement per UL 2231 EMC requirements External Remote E Stop Remove high power if external E stop is activated Remove high power if external E stop is activated GROU...

Страница 13: ...ssion BTCPower 200 KW EVSE Installation manual Rev K Page 13 of 26 Fig 1 AC input terminal lugs DC Converter Output terminal block from converter to dispenser single and dual high output configuration...

Страница 14: ...WIRE RANGE OPENINGS PER POLE PART NUMBER AMPERE RATING Terminal Block Mersen Cu wire 2 0 14 1 MPDB63153 175 Torque requirement per UL E file Mersen MPDB63153 Terminal block primary side from converte...

Страница 15: ...tinuous 250 Amps Maximum DC Output Current CHAdeMO continuous 200 Amps Minimum Current In current mode 5 Amps DC power input voltage range 50 920 VDC DC power input current range 5 Amps 500 Amps Outdo...

Страница 16: ...ge range 50 920 VDC DC power input current range 5 Amps 500 Amps Outdoor enclosure NEMA 4 IP 54 equivalent Chilled 50 50 ethylene glycol 20 C input Temperature Flow rate 10 l min Weight 600 lbs LED li...

Страница 17: ...eproduced or used as the basis for sale or manufacture of apparatus without written permission BTCPower 200 KW EVSE Installation manual Rev K Page 17 of 26 Auxiliary 120 VAC Single Phase 20 Amps Optic...

Страница 18: ...or additional details Cable Length o 4 5 meter outside length standard o Optional longer length available Cable Management System o None This will be a non retractable cable system 5 Electrical and co...

Страница 19: ...steel pedestal provided with the BTCP EV Charging Station WARNING BTCP EV Charging Station can only be installed onto undamaged concrete slab A minimum of 4 expansion bolts should be mounted on the bo...

Страница 20: ...ear the fault 230 Over current This is a hard fault that results in out of service Press STOP and then START to restart the application to clear the fault 240 Over temperature This is a hard fault tha...

Страница 21: ...of 26 8 Installation Line Drawing 200 KW Configuration Note Conduit 2 shall contain optical shielded interlock wire and CAT6 wire Note Interlock between dispenser and tower will shut down DC output f...

Страница 22: ...d reproduced or used as the basis for sale or manufacture of apparatus without written permission BTCPower 200 KW EVSE Installation manual Rev K Page 22 of 26 9 Installation Line Drawing 50 KW Configu...

Страница 23: ...f Broadband Telecom Power Inc and will not be copied reproduced or used as the basis for sale or manufacture of apparatus without written permission BTCPower 200 KW EVSE Installation manual Rev K Page...

Страница 24: ...band Telecom Power Inc and will not be copied reproduced or used as the basis for sale or manufacture of apparatus without written permission BTCPower 200 KW EVSE Installation manual Rev K Page 24 of...

Отзывы: