20
B
H
L
2. Installation in the raised access floor
Step 1
Remove the lid and unscrew the device
carrier from the housing .
Step 2
Saw/cut a cut-out in the size of the
housing
installation dimensions
(!)
into the raised floor (H)
at the desired position. Then lay the conduits (L)
to this position. If not present, lay flooring (B).