Technical data
and start-up
EVB1-350/400-40-HP
66
PROCEDURE STEP
ILLUSTRATION / OTHER INFORMATION
28.
Tighten the cable glands (1) and the union nuts (2)
with the special key (3).
29.
Remove the protective caps for the cooling water
connection pieces (1) and connect the cooling water
pumps with the hose clips.
30.
Start the software
PARAM
.
---
31.
Check the set parameters with the software
PARAM
or adapt these to your requirements.
See chapter
10.3 Changing the CAN Parameters
---
Содержание EVB1-350-40-HP
Страница 33: ...33 Technical data and start up EVB1 350 400 40 HP 6 6 1 EVB1 400 350 40 HP Block Circuit Diagram...
Страница 42: ...Technical data and start up EVB1 350 400 40 HP 42 6 9 2 Control via Terminal 15 with Driving via CAN...
Страница 98: ...Technical data and start up EVB1 350 400 40 HP 98 V Validity of the Manual 3...