Technical data
and start-up
EVB1-350/400-40-HP
60
9
Installation / Initial Start-up
DANGER
High voltage!
Danger to life!
When the battery is switched on, the HV connections are under high voltage! Never remove the BMS
cover when the battery is switched on!
You must pull out the control plug before you remove the BMS cover!
DANGER
High voltage!
Danger to life!
Despite faults being present the HV wiring can still be under high voltage! Always shut down the HV
supply via the emergency stop before starting work on the battery!
The customer must install a large, easily accessible emergency stop switch, we recommend
connecting it (interlock and emergency stop) via the PDU.
INFORMATION
Make visual checks on the packing material and the device itself in particular for damages before
installation. Each device undergoes a strict quality and function test at BRUSA before distribution.
However, we have no control over transportation routes which can sometimes take a long time and
the shipping of our products.
PROCEDURE STEP
ILLUSTRATION / OTHER INFORMATION
1.
Unpack the battery.
See chapter
---
2.
Insert the battery into position and connect the
mechanical coupling components.
Please adhere to the installation instructions,
see chapter
---
3.
Wire up the control plug.
See chapter 7.3 Pin Assignment of Control Plug
(Device-side)
See chapter
6.6.1 EVB1-400/350-40-HP Block
---
Содержание EVB1-350-40-HP
Страница 33: ...33 Technical data and start up EVB1 350 400 40 HP 6 6 1 EVB1 400 350 40 HP Block Circuit Diagram...
Страница 42: ...Technical data and start up EVB1 350 400 40 HP 42 6 9 2 Control via Terminal 15 with Driving via CAN...
Страница 98: ...Technical data and start up EVB1 350 400 40 HP 98 V Validity of the Manual 3...