Installation and Operation of the CHC plus Humidity Chamber
DOC-M88-EXX268_V1_12.2016
69
Figure 7.14: Water flow controller
1
to Julabo
3
to TCU 110 / CCU 100
2
from CHC plus
The water flow controller must be inserted in the backflow of the CHC plus chamber.
7.4
Configuring the Chamber in DIFFRAC.MEASUREMENT
CENTER
Normally, Anton Paar stages come preinstalled with a new system or will be installed by a
Bruker technician upon purchase. They should therefore be ready to use. If this is not the
case, or for some reason the chamber needs to be reinstalled in DIFFRAC.MEASURE-
MENT CENTER, we refer to chapter
7.5
Operation
NOTICE
Operation above 300 °C requires vacuum. Operation below ambient temperatures
requires inert gas (down to ‑120 °C) or vacuum (down to ‑180 °C). See
Anton Paar
Manuals
for details.
Содержание Anton Paar
Страница 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Страница 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Страница 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Страница 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Страница 58: ...Installation and Operation of the HTK Series TTK 600 XRK 900 and HPC 900 Chambers 58 DOC M88 EXX268_V1_12 2016 ...
Страница 111: ...Appendix Service Details DOC M88 EXX268_V1_12 2016 111 Figure 10 15 CHC_Stage Sample Temperature Details ...
Страница 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Страница 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...