Connect the battery charger to the charging connector (pos. 1).
Fig. 1
Æ
Connect the battery charging unit to a 110-230V, 50-60Hz power supply. During the
charging procedure, the charge indicating lamp will light up red.
Æ
At completion of the charging process, the control lamp will change to green, but the
charging current will remain, thus warranting a fully charged battery.
Æ
The charging time amounts to approx. 12
hours.
¿
Note:
The battery charger may be connected to the battery for a longer period, as the
battery takes just the current required to be fully charged.
¿
Note:
A non-extinguishing red control lamp, even after 24 hours of
charging, indicates that the charging capacity of the battery is
diminishing.
¿
Note:
A red/green blinking of the charging control lamp indicates transition from main
charging to additional charging and does not signal a faulty battery charger.
Æ
Unplug power supply to battery charging unit.
Æ
Remove output wires of the battery charger from the battery.
Æ
The battery is ready again for use.
¢
Attention: In addition to these directives, follow the advice of the battery charging unit
manufacturer.
¿
Note:
When the battery is charged while not mounted on the kart, use the adapter cable
(part no. 266022). If needed, contact your authorized distributor or one of their
ROTAX service centers.
The charging condition of the battery can be estimated using a commercially available measuring
instrument.
Содержание ROTAX 125 MAX DD2 evo
Страница 2: ...Page 1 70 Edition 09 2016 General information BRP Rotax recommends products of the following companies...
Страница 5: ...Page 4 70 Edition 09 2016 INSTALLATION INSTRUCTIONS FOR ROTAX ENGINE TYPE 125 MAX DD2 evo...
Страница 41: ...Installation Instructions 125 MAX DD2 evo Page 40 70 Edition 09 2016 K00365 Fig 58...