73
ELECTRICAL
BATTERY CHARGING SYSTEM
4
Fuse Case
Disconnect battery cables at the battery.
Disconnect white lead wire of rectifier from engine
wire harness.
Check continuity between white lead wire of
engine wire harness and red lead wire of starter
motor magnetic switch “B” terminal.
If no continuity is indicated, replace engine wire
harness and/or fuse.
Removal and Installation
Before removing electrical parts:
•
Disconnect battery cables at the battery.
•
Twist and remove all spark plug leads.
Battery Charge Coil
Remove flywheel, screws, and battery charge coil.
Refer to
Rectifier and Regulator
Remove the screws securing the rectifier and reg-
ulator.
Disconnect lead wire connectors.
Installation
Installation is reverse order of removal with spe-
cial attention to the following steps:
Check wire routing. Refer to
1.
White rectifier lead
005562
1.
Red magnetic switch lead
2.
Starter magnetic switch
005563
1
1
2
005564
1.
Screws
2.
Rectifier/regulator
005565
2
1
Содержание Johnson BJ25E4SUC
Страница 1: ......
Страница 2: ......
Страница 66: ...64 MAINTENANCE NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other ...
Страница 104: ...102 IGNITION SYSTEM NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other ...
Страница 124: ...122 FUEL SYSTEM NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other ...
Страница 172: ...170 POWERHEAD NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other ...
Страница 238: ...S 2 ...
Страница 265: ......