
III - 53
Pass the rotation shaft through the hole in the main chassis from the outside in the
direction of the arrow.
Pass the rotation shaft through the head guide spring, the head holder assy, head
holder springs R and L, and the hole on the opposite side of the main chassis, and
set the two retaining rings on the rotation shaft.
Set the hooks of head holder springs R and L on the projections of the main
chassis, as shown in Fig. 3.66.
Head guide spring
Head holder assy
Main chassis
Head holder spring R
Rotation shaft
Retaining ring
Head holder spring L
Retaining ring
Fig. 3.66
Содержание SC-2000
Страница 1: ...Stamp Creator PRO SERVICE MANUAL MODEL SC 2000 Version A ...
Страница 2: ...Stamp Creator PRO SERVICE MANUAL MODEL SC 2000 ...
Страница 13: ...I 7 Fig 1 6 ID Label 1438 Fig 1 7 ID Label 1850 Fig 1 8 ID Label 2770 ...
Страница 118: ...II 4 Fig 2 2 Block Diagram of the Electronic Part ...
Страница 132: ...III 14 Fig 3 15 Stamp Size Detection Open Cover Detection and Key Scanning Circuit ...
Страница 138: ...III 20 Fig 3 21 Control Panel PCB Circuit ...
Страница 144: ...APP 1 ...
Страница 145: ...APP 2 ...
Страница 146: ...APP 3 ...
Страница 147: ...APP 4 D 100V AC System Power Supply Circuit ...
Страница 148: ...APP 5 E 200V AC System Power Supply Circuit ...
Страница 149: ...APP 6 ...
Страница 150: ...Sep 98 5V5014BE0 Printed in Japan ...