3-33
Confidential
9.8 Inner chute ASSY
(1) Pull down the Green envelope levers on both sides of the Fuser unit.
(2) Remove the two Taptite bind B M4x12 screws, and remove the Inner chute ASSY.
Fig. 3-20
Assembling Note:
• When attaching the Inner chute ASSY, engage the Hooks on the Inner chute ASSY
with the Positioning holes on the Joint cover ASSY.
• After assembling the Inner chute ASSY, pull up the Green envelope levers on both
sides of the Fuser unit.
Fuser unit
Hooks
Green
envelope lever
Taptite bind B
M4x12
Inner chute ASSY
Green envelope lever
Fuser unit
Содержание DCP-2537DW
Страница 50: ...2 10 Confidential MP models Fig 2 6 Feed from MP tray Eject to back side Back side Front side ...
Страница 51: ...2 11 Confidential 2 2 2 Scanner part Fig 2 7 Document feed path ...
Страница 159: ...3 2 Confidential 2 PACKING Fig 3 1 Option carton Carton Polystyrene pad ASSY Spacer carton Option carton TBOX ...
Страница 240: ...3 83 Confidential 9 25 Filter 1 Release the Hook to remove the Filter from the Air duct Fig 3 79 Hook Filter Air duct ...
Страница 300: ...5 28 Confidential Print adjustment test pattern Fig 5 11 ...
Страница 311: ...5 39 Confidential Print pattern Fig 5 16 W 100 K 1 K 100 Total Lattice K 5 ...
Страница 316: ...5 44 Confidential Test pattern Fig 5 19 ...
Страница 332: ...5 60 Confidential ...