Commissioning/Handover
Ensure all parts are fitted in accordance with these instructions.
On completion of the installation allow a suitable period of time for any fire cement and
mortar to dry out, before lighting the stove. Once the stove is under fire check all seals for
soundness and check that the flue is functioning correctly and that all products of
combustion are vented safely to atmosphere via the chimney terminal.
On completion of the installation and commissioning ensure that the operating instructions
for the stove are left with the consumer. Ensure to advise the customer on the correct use
of the appliance and warn them to use only the recommended fuel for the stove.
Advise the user what to do should smoke or fumes be emitted from the stove.
Upon completion of the commissioning process your installer needs to complete and sign
the commissioning statement, which can be found towards the end of these instructions
See “Commission Statement”.
CO Alarm
Your installer should have fitted a CO alarm in the same room as the appliance. If the
alarm sounds unexpectedly, follow the instructions given in section “Warning Notes” under
“Fumes”..