background image

 

6/21 

 

3.0  Specifications/ Dimensions 

 

Product 

Version

 

Weight  A 

E

 

aircycle ONE+ 100 

2,3 kg  218 

76 

270-510 

108 

164 

117,5 

39 

23 

124 

44 

26,5 

aircycle ONE+ 150

 

3,9 kg  218 

76 

300-560 

158 

218 

117,5 

39 

23 

124 

44 

26,5 

 

3.2  Detailed Specification  

 

IPX4 protection degree. 

 

Aesthetic front cover easily removeable for cleaning without the need for tools. 

 

Automatic management of the inversion time (comfort mode) to optimise the 
acoustic and thermal comfort. 

 

Free cooling (single direction flow; extract or intake) to prevent heat exchange 
when not requested. 

 

Integrated multi-colour led to indicate unit status. 

 

Simplified  synchronisation  of  up  to  10  units:  units  get  automatically 
synchronised when they are wired to each other. 

 

Totally recyclable plastic components.  

 

Double insulated: no earth connection is required. 

 

Tested to the latest standards: units are tested in the TÜV Rheinland recognised 
laboratory. Designed and manufactured in accordance with EN60335-2-80 (Low 
Voltage Directive) and the EMC Directive (Electromagnetic Compatibility). 

 

No water drainage required. 

 

Multifunctional remote controller with an LCD screen. 

 

Back-up touch button at the side of the ventilation unit. 

 

Smart humidity control increasing extract speed when needed. 

 

Easy  and  safe  maintenance  thanks  to  a  magnet  system  which  allows  the 
ventilation unit to be quickly removed from its base. 

 

Automatic anti-frost protection. 

Содержание AF 90-CYC-ONEP-100

Страница 1: ...ation maintenance user manual Applicable to the following Aircycle ONE models PRODUCT CODE DESCRIPTION AF 90 CYC ONEP 100 aircycle ONE 100 AF 90 CYC ONEP 150 aircycle ONE 150 single room heat recovery...

Страница 2: ...2 0 Safety 3 2 1 Technical specifications 4 2 2 Responsibility of the Installer 5 2 3 Responsibility of the Occupant 5 3 0 Specifications Dimensions 6 3 2 Detailed Specification 6 3 3 ErP Directive R...

Страница 3: ...ling problems associated with condensation dampness such as mould growth It is recommended that two units are installed in pair when one unit is pulling the other is pushing Pair of units can be insta...

Страница 4: ...fully to ensure safe installation and operation of the unit The device should not be used for applications other than those specified in this manual After removing the product from its packaging verif...

Страница 5: ...sure adequate air return discharge into from the room in compliance with existing regulations in order to ensure proper device operation If the environment in which the product is installed also house...

Страница 6: ...he unit is double insulated no earth connection is required No need of condensation drainage system IPX4 degree of protection Power supply 220 240V 50Hz 2 2 Responsibility of the Installer Correct Ins...

Страница 7: ...unit status Simplified synchronisation of up to 10 units units get automatically synchronised when they are wired to each other Totally recyclable plastic components Double insulated no earth connect...

Страница 8: ...nput SPI W m3 h 0 139 0 80 n1 Control factor 0 65 0 65 n2 Control typology Local demand control o1 Maximum internal leakage rate N A o2 Maximum external leakage rate 1 1 p1 Internal mixing rate N A p2...

Страница 9: ...ng functionalities can be activated deactivated When a setting is transferred to the unit a short acoustic signal is emitted and a green led flashes In case the remote controller gets lost or the batt...

Страница 10: ...9 21...

Страница 11: ...uct in question at suitable electronic and electro technical waste disposal collection centres or else send the product back to the retailer when purchasing a new equivalent type device Separate colle...

Страница 12: ...11 21 5 0 Installation and figures...

Страница 13: ...12 21...

Страница 14: ...13 21...

Страница 15: ...14 21...

Страница 16: ...15 21...

Страница 17: ...16 21...

Страница 18: ...17 21...

Страница 19: ...18 21...

Страница 20: ...19 21 Notes...

Страница 21: ...20 21 Notes...

Страница 22: ...happy to assist you Brookvent Brook House Dunmurry Industrial Estate Dunmurry Belfast Northern Ireland BT17 9HU T 44 0 28 9061 6505 It is important to retain this manual and make a copy available to...

Отзывы: