Installation
MagnaTran 7.1 User’s Manual
Site Requirements
MN-003-1600-00
Brooks Automation
3-2
Revision 2.2
Site Requirements
Before the MagnaTran 7 Robot may be installed, the site where the robot will be
located must be properly prepared. This preparation includes ensuring that the
proper facilities including electrical and communications connections are available
and are properly prepared for the robot.
Space
The chamber where the MagnaTran 7 Robot will be installed must meet the minimum
space requirements specified in
to ensure proper clearance for operation
and servicing of the robot.
CAUTION
All drawings within this manual are generic and may not reflect spe-
cific builds of the robot. To obtain a complete and current set of draw-
ings and documents contact Brooks Customer Support.