background image

Figure 4

Figure 2

Figure 1

Figure 3

DOOR PREPARATION

INSTALL STRIKE

1. Align strike with latch.
2. Trace strike outline on door jamb.
3. Mortise jamb and install strike and dust box.

INSTALL LATCH

1. Drill 1" diameter hole for latch. Mortise for latch front. Insert latch and fasten with

two screws.

HOLLOW METAL DOORS

1. Must have horizontal and vertical lock and latch support provided by door

manufacturer.

1. With IC core removed, use screwdriver inside lever

to depress lever latch.

2. Pull off lever.

To Adjust For Other Door Thickness:

Remove outside lever.

3

. Reinstall outside lever.

Figure 

5

I-C300-2013-01   Page 1

DOOR PREPARATION

DOOR THICKNESS ADJUSTMENT

How To Remove IC Lever

 (Fig. 

6

):

2. If  2-1/8"

(54mm) 

hole  exists,  use  optional

 an

 Installation  

a

Jig

 

to  ensure accurate drilling of 5/16"

 (8mm)

 thru-bolt holes.

1. Fold and apply template to high edge of door at desired height from 
floor. 2. Mark hole centers on door and door edge.
3. Drill 5/16" 

(8mm) 

thru-bolt holes first, then drill 2-1/8" 

(54mm) 

hole.

NOTE: It is important that both 1"

 (25.4mm) 

 and 2-1/8"

 (54mm)

 holes be 

on the same horizontal center line.

1.

Locks are factory assembled with  a ring for 1-3/4" 

(44mm) 

thick door. 

Locks can be adjusted for

1-5/8"

(44mm)

 to 1-7/8"

(48mm) 

 door thickness.

2. Before installation, use door thickness gauge on

template as shown in Fig. 5, to check lock chassis
position. Center of latch retractor should align with 
mark on gauge for appropriate door thickness.
If chassis is not on center, screw chassis in or out to
 align with mark. 

Check that lever engages lever 

catch before installation. If adjusting for doors

less

 than 1-3/4"

(44mm) 

 thickness, 

the 

split 

spacer must be removed.

      C300

 

SERIES

 Grade 1 

Cylindrica

l Key in Lever

       

Install

ation

  Inst

ructions         I-C300-2013-01

Split Spacer 

 

(8mm)

 (70mm)

(54mm)

Отзывы: