500mm
368mm
(14.5")
(20")
A
2 layers of minimum 16mm (5/8")
fireproof insulation must be installed
on all surfaces of ceiling box
Supporting structure
for fireproof insulation
Fireproof
insulation
Ceiling surface
1. Prepare ceiling cut out & ceiling box.
Ceiling box minimum internal dimensions must
be as showin table.
Heater must be installed with heater surface at
least 2400mm above the floor level.
2. From below, bring ceiling frame up and into
ceiling cut out.
3. Fasten ceiling frame to ceiling box
through
mounting holes with fasteners (not supplied).
4. Prepare heater for installation
Attach mounting brackets to both ends
of heater with supplied fasteners
CEILING RECESS KIT (SOLD SEPARATELY)
MODEL
DIMENSION "A"
2000W & 4000W
1170mm (46")
3000W & 6000W
1463mm (57.5")
www.bromicheating.com