24 Aug 2021
Broadcom, the pulse logo, Connecting everything, Avago Technologies, Avago, the A logo, Symantec, the Symantec logo, the Checkmark logo, Blue Coat, and the Blue Coat
logo are among the trademarks of Broadcom and/or its affiliates in the United States, certain other countries, and/or the EU. Copyright © 2021 Broadcom. All Rights Reserved.
The term “Broadcom” refers to Broadcom Inc. and/or its subsidiaries. For more information, please visit
www.broadcom.com
.
1 — Unpack the Appliance
Unpack the shipping package for the appliance and verify it
includes the following:
MC
-
S400 appliance
(2) AC power cords
(1) Null-modem serial cable
Grounding Hardware
2- and 4-post slide-rail kit
Accessing Appliance Documentation
Software License Agreement
Hardware Warranty Information
2 — Connect Cables
It is recommended that you plug in cables, verify LEDs, and
configure and license the appliance before mounting it in an
equipment rack. Make sure the appliance is on a flat, level
surface when performing the initial configuration. If you would
rather mount the appliance before performing configuration
.
The following procedure describes a typical deployment for
MC
-
S400 appliances (as shown in
Figure 1
). For information
on other deployments, see the Management Center software
documentation, available at:
NOTE:
Network cables are not included with the appliance.
Make sure to use only straight-through Ethernet cables.
Category 5E cables or better are recommended for
1000Base-T operation. Category 6A cables are
recommended for 10GBase-T operation.
Figure 1: MC
-
S400 Deployment
Management Center Quick Start Guide
MC
-
S400 Appliance