11
4.3 Condensate Drain
All Icebox models have a
3/4” BSPM
thread protruding from the bottom of the cabinet to facilitate
connection to a drain.
•
A non-flexible drainpipe shall be installed for condensate run-off with a continuous downward grade
away from the unit of not less than 1:50.
•
The drain shall be plumbed to a suitable point in order to disperse the waste water away without
causing damage or nuisance, i.e. pooling of water, accelerated corrosion.
4.4 Electrical Connection
The unit is pre-wired with a 3-pin plug and 2.5m lead, and should be plugged into a standard 10 Amp
220 to 240 Volt fixed switched socket outlet adjacent to the unit, in a convenient location so it can be
turned OFF quickly and easily.
The electricity supply shall be 220 to 240 Volt at 50 Hz, and from an authorised power supplier.
Generators should never be used, as their output may be incompatible with, or prone to damage the
unit’s electronic components.
4.5 Thermistor Location – BX5 Models
The thermistor will have to be repositioned to the in-cabinet thermistor arm. Install the thermistor as
follows:
a. Orientate the unit onto the fan cabinet end and remove all packaging.
b. Remove the thermistor loom from thermistor L-bracket.
c. Attach thermistor head to the inbuilt thermistor arm. Ensure excess wiring is safely routed away
from the heat source.
d. Bend the thermistor arm down to an angle of 45 degrees and away from the heat exchanger until
it touches the stopper plate. Excessive force is not required. See Diagram 10.
Diagram 10:
Thermistor Mounting Location - BX5 Models
Note:
A qualified electrician must install the 220 to 240 Volt wiring according to local regulations.