REFRESH
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Assembly, Installation and Commissioning
2.1.5
Storage and Preservation
2.1.5.1 Storage
Caution:
Supplied packaging provides protection against scratches and scrapes only.
Items must not be stored in high traffic areas. No impact protection is provided.
2.1.5.2 Preservation
Items must be stored in dry conditions.
2.2
Assembly
2.2.1
Preparation for Unpacking
Step 1:
Ensure you place items to be unpacked as near as possible to the site of installation.
Step 2:
Ensure you have sufficient free space to work.
2.2.2
Unpacking Procedures
Step 1:
Using a suitable tool, remove the plastic banding around the item
Step 2:
Remove all packaging as necessary.
2.2.3
Preparation for Assembly
2.2.3.1 Personnel
Skilled site engineers
Senior site installation engineers (site Foreman).
2.2.3.2 Personal Protective Equipment (PPE)
The need for
PPE
must be identified once a full risk assessment has been carried out. Refer to
Below is a list of PPE that
must
be worn when assembling BKV equipment:
Safety footwear with steel mid-sole, steel toe caps, padded ankle protection and high grip
soles.
High visibility vest
Kevlar
gloves
Carpenter
gloves
Safety spectacles
Safety
goggles.
Tools Required:
Suitable and approved lifting equipment
Adjustable support stands
Spirit
level
Suitable hand tools]
Suitable spanner to tighten M10 fixings.
Drawings:
for reference.
Page 18 of 70