Pressure
BAR
1.0
5.0
4.0
2.0
3.0
0.
Pressure
BAR
1.0
5.0
4.0
2.0
3.0
0.
Specifications
Maximum Static Pressure:
10.0 bar
Inlet Water Temperature
Min:
0.2 bar
Max:
5.0 bar
Dynamic Water Pressure
5°C
25°C
Cold Water Supply
Min:
5°C
Max:
25°C
65°C Recommended
Tools You’ll Need
Hot Water Supply
Pack Contents
65°C
150
Centres
15mm
Compression
Inlet Connections
Inlet Dimensions
IMPORTANT
The inlet hot water must
be at least 10°C above the
required blend temperature.
Cavity Depth:
35mm
Concealing Plate
Adjustment Range:
15mm
Cavity Dimensions (mm)
35
60
15
120
Hot
Cold
5
4
1
2
Prepare the pipework.
Create the rear access point in the
back of the wall cavity.
Secure the valve using the
screws supplied (solid walls
only) or a suitable alternative.
Connect the inlet
pipes ensuring the
olives are fitted.
Screw the shrouds
onto the valve.
Plumb the
valve into
your chosen
outlets
.
Elbows can
be point
ed up
or down
7
2.5
mm
Finish the
wall surface,
ensuring there
is at least a 10mm
gap between the
cavity and the edge
of the face plate.
Using a silicon
sealant, push on the
concealing plate and
hold firmly until set.
6
Fit the handles.
3
1
2.5
mm
Fit the temperature
handle back in the
maximum hot position.
2.5
mm
Turn the handle to the
maximum temperature
setting, then remove it.
Temperature Adjustment
REMEMBER
To service
your
product!
Decrease
Temperature
Pre-set t
o
42
°
C
2
Turn the spindle
to increase or
decrease the
temperature.
Check the
temperature and
adjust until you
achieve the
desired result.
Increase
Temperature
3
Min 35mm
Batons
Install suitable
batons
(if required) onto
the rear cavity.
Mark the position
of the valve
and drill and plug
holes to suit.
Max 60mm
x1
x3
x4
x2
x1
x2
x3
x1
x1
Flat head
Screwdriver
Silicon Sealant
Hexagonal Keys
Pipe Cutter
Drill
Adjustable Spanner
Pipe & Wire Detector
Socket Spanner
Green Flow
Limiter (Cold)
1
Valve Configuration
Installation
Remove the inlet elbows and filters.
Remove the plastic inserts from the valve
inlets and insert the flow regulators.
Replace the elbows, ensuring the
filters are fitted.
IMPORTANT
If installed in
conjunction with
combination
boiler flow
regulators
must
be
fitted.
Yellow Flow
Limiter (Hot)
REMEMBER
hot on the left,
cold on the
right
2
IMPORTANT
Rear access to the
shower is r
equired
for maint
enance
and servicing
Installation Instructions
& User Guide
Prior to Installation
Please leave these instructions
with the end user
All products manufactured and supplied by Bristan are safe to use
provided that they are installed, operated and receive regular
maintenance in accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999
and current by-laws. For full Installation Requirements & Notes (IRN)
please visit
wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease
of future maintenance. Before installing this product the water supply
must be thoroughly flushed in order to remove any swarf, solder etc.
Full access must be made available for future maintenance/
servicing purposes.
Before drilling into walls, check that there are no hidden electrical
wires, cables or water supply pipes. This can be checked with the
aid of an electronic detector.
If power tools are used do not forget to:
- Wear eye protection
- Unplug equipment after use
This product must not be modified in any way
as this will invalidate the guarantee.
If in doubt, contact a registered plumber, your Local Water
Authority or the Secretary of the Institute of Plumbing,
address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Product Code: HOU SHC3DIV C (D6)