background image

2

5

         Identify the    

   required position of 

the valve and prepare 

the water supply pipes. 

Supply pipes should be 

150mm apart.

Using the rubber fixing 

plate supplied with the 

wall mount, mark and 

drill holes.

Secure the isolator 

Secure the isolator 

onto the backplate 

onto the backplate 

ensuring the olive is 

ensuring the olive is 

positioned over the 

positioned over the 

pipework correctly.

pipework correctly.

Push shrouds to the 

Push shrouds to the 

back of the wall outlet, 

back of the wall outlet, 

securing them against 

securing them against 

the rubber fixing plate.

the rubber fixing plate.

4

3

1

15mm 

Compression

 

Installation

150mm C

entr

es

Rotate the shroud until 

Rotate the shroud until 

the opening aligns with 

the opening aligns with 

the isolation screw.

the isolation screw.

Turn the screw to isolate 

Turn the screw to isolate 

the water. Reverse the 

the water. Reverse the 

process when turning 

process when turning 

the water back on.

the water back on.

1

Isolation

2

Remove the concealing 

Remove the concealing 

cap from the shroud.

cap from the shroud.

Secure the rubber backplate 

Secure the rubber backplate 

and backplate into place.

and backplate into place.

Secure the shower to 

Secure the shower to 

the wall mount.

the wall mount.

21mm

21mm

REMEMBER 

To service 

your 

product!

Operation

IMPORTANT

Pack Contents

150mm

Centres

1.0

5.0

Pressure

BAR

0.2

4.0

2.0 3.0

Pressure

BAR

1.0

5.0

0.2

4.0

2.0

3.0

60°C

65°C

Specifications

Maximum Static Pressure: 

10.0 bar

Inlet Water Temperature

15mm 

Compression

 

Inlet Connections

Min: 

0.2 bar

Max: 

5.0 bar

Working Pressures

The inlet hot water must 

be at least 10°C above the 

required blend temperature.

Factory pre-set

42°C

Inlet Dimensions

5°C

25°C

Cold Water Supply

Min: 

5°C

 Max: 

25°C

Hot Water Supply

Tools You’ll need

Flat head Screwdriver

Cross head Screwdriver

Hexagonal Keys

Pipe Cutter

Pencil

Drill

Spanner

Installation Instructions 

& User Guide

Please leave these instructions 

with the end user

Product Code: CRZ SHXDIVCTFF C (D2)

All products manufactured and supplied by Bristan are safe to use provided that 
they are installed, operated and receive regular maintenance in  
accordance with these instructions. 

This product needs to be installed in accordance with, and meet the  
requirements of the Water Supply (Water Fittings) Regulations 1999 and  
current by-laws. For full Installation Requirements & Notes (IRN) please  
visit 

wras.co.uk/directory. 

Isolation valves must be fitted to the inlet water supplies to ensure ease of future 
maintenance.  

Before installing this product the water supply must be thoroughly flushed in 
order to remove any swarf, solder etc. 
 
This product must not be modified in any way as this will invalidate the  
guarantee. 

Full access must be made available for future maintenance/servicing purposes.

Before drilling into walls, check that there are no hidden electrical wires,  
cables or water supply pipes. This can be checked with the aid of an  
electronic detector. 

If power tools are used do not forget to:  
 

- Wear eye protection

 

- Unplug equipment after use

If in doubt, contact a registered plumber or your Local Water Authority or  
the Secretary of the Institute of Plumbing, address as follows:-

The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791

Prior to Installation

60-65°C Recommended

REMEMBER 

hot on the left, 

cold on the 

right

Hot

Hot

Cold

Cold

On - Fixed 

On - Fixed 

Head

Head

On - 

On - 

Handset

Handset

x2

x2

x2

x2

x8

x8

x2

x2

x2

x2

x4

x1

x1

x1

x1

x1

x1

x1

x1

x1

Safety Glasses

Detector

Отзывы: