background image

This document and all copies are the property of Safeworks. All dimensions and data are indicative only.

The user must ensure that the equipment complies with local rules and regulations.

Document No: 720900-1

Issue Date: 2018-Sep-20

Revision: C

Page 1 of 13

Manufactured by: Safeworks  |  365 Upland Drive, Seattle, WA 98188 

Phone: (855) 457-8513  |  Fax: (206) 575-6240

Email: [email protected]  |  Website: SpiderStaging.com

Operator’s Manual for

ProCut Belt Cutter (720905-1)

Содержание 720905-1

Страница 1: ...equipment complies with local rules and regulations Document No 720900 1 Issue Date 2018 Sep 20 Revision C Page 1 of 13 Manufactured by Safeworks 365 Upland Drive Seattle WA 98188 Phone 855 457 8513...

Страница 2: ...l Only authorized persons shall operate this belt cutter Only use an impact wrench with max torque of 350 Nm 260 ft lb Any operation in violation of these instructions is at the operator s own risk an...

Страница 3: ...vision C Page 3 of 13 1 PARTS OF THE PROCUT BELT CUTTER Shoulder Screw M8x25 722272 1 Detent Pin UP 12636 08 Shear Ram 2 UP 12636 07 Threaded Rod UP 12636 06 Handle UP 12636 09 Top Block UP 12636 04 S...

Страница 4: ...nd regulations Document No 720900 1 Issue Date 2018 Sep 20 Revision C Page 4 of 13 2 HOW TO USE THE PROCUT BELT CUTTER Step 1 Turn the threaded rod counterclockwise until it is fully seated against th...

Страница 5: ...ies with local rules and regulations Document No 720900 1 Issue Date 2018 Sep 20 Revision C Page 5 of 13 Step 3 Place belt cutter jaws around elevator belt NOTE Ensure belt lays flat between the betwe...

Страница 6: ...with local rules and regulations Document No 720900 1 Issue Date 2018 Sep 20 Revision C Page 6 of 13 Step 5 Using a 19 mm or 3 4 socket and impact wrench on the hex end of the threaded rod drive the...

Страница 7: ...s Document No 720900 1 Issue Date 2018 Sep 20 Revision C Page 7 of 13 3 SERVICING THE PROCUT BELT CUTTER Disassembly Step 1 Pull out the detent pin as far as it will go and open the belt cutter Step 2...

Страница 8: ...Sep 20 Revision C Page 8 of 13 Step 4 If replacing shear rams shear ram holders or handle remove the two M10x60 bolts using two 16 mm wrenches Servicing Step 1 Every 100 cuts or when all wires are no...

Страница 9: ...of the threaded rod and to the inside of threaded hole in the Top Block Apply copper anti seize to rod and Top Block threads Reassembly Step 1 Orient Shear Ram 1 so that the cutout in the bolt hole r...

Страница 10: ...f 13 Step 2 Orient Shear Ram 2 so that the cutout in the bolt hole reinforcement faces DOWN Align the holes of Shear Ram 2 with the holes on Shear Ram 1 and the Handle as shown below Insert the two lo...

Страница 11: ...f the two Spring Plungers into the bottom of the Top lock using small flathead screwdriver Apply Loctite 243 to the remaining threads of the spring plungers and continue to screw them in Detent Pin Sp...

Страница 12: ...p 5 Screw the Threaded Rod into the Top Block just far enough to slide the blade sideways onto the round end of the threaded rod Once the blade is in place and aligned with the channel of the Top Bloc...

Страница 13: ...ndicative only The user must ensure that the equipment complies with local rules and regulations Document No 720900 1 Issue Date 2018 Sep 20 Revision C Page 13 of 13 Step 7 Pull out the detent pin and...

Отзывы: