background image

7

Bradley Corporation • 215-1372 Rev. F; EN 03-045

Terreon® Tri-Fount™ Wall-Hung Washfountain with Battery-Operated Infrared Control

Installation Instructions

MF2939/BIR

9-17-2003

Installation Instructions continued . . .

Step 4: Assemble and install bowl

1. Install two 3/8" wall anchors (supplied by installer). These will be used to mount the bowl to the

wall.

WARNING:  Do not attempt to install the bowl by yourself. To prevent serious injury,

install the bowl with the assistance of another person and always use
appropriate lifting procedures.

2. With the help of an an assistant, carefully lift the bowl on the pedestal frame using appropriate

lifting procedures. Ensure bowl remains 3 - 4 inches from the wall.

WARNING: Do not leave the bowl on the pedestal unsupported, as it may fall and

cause personal injury or damage to property.

3. Install the 2 wall anchor brackets to the back of the bowl using the 3/8-16 x 2" hex head bolts,

13/32" I.D. plain washers, anchor plates, lockwashers and hex nuts provided as shown in Figure 4.

4. Remove valve boxes from the bowl assembly.

5. Secure the bowl’s wall brackets to the wall anchors with two 3/8" diameter bolts and washers

(supplied by installer).

6. Fasten the front underside of the bowl to the upper bracket on the pedestal frame with the two

1/4-20 x 1/2" round head screws and 5/16" I.D. washers supplied.

7. Install the drain spud in the bowl using plumber’s putty (see Figure 5) (discard rubber washer).

8. From beneath bowl, thread the washer and locknut onto the drain spud and tighten the locknut

against the bowl.

9. Install strainer in the bowl drain using the two #10-24 x 1/2" oval Phillips head screws supplied.

Figure 4

Figure 5

Spud

Washer

#10-24 x 1/2"
Screw for
Strainer

Drain

Spud

Dome

Strainer

Discard this
washer; it is not
used on
washfountains

Washfountain
Bowl

Spud

Locknut

Drain Assembly

Back View of Washfountain Bowl

Содержание Terreon Tri-Fount Multi-Fount MF2939/BIR

Страница 1: ...estrictions 16 215 1372 Rev F EN 03 045 2003 Bradley Corporation Page 1 of 16 9 17 2003 P O Box 309 Menomonee Falls WI 53052 0309 TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com IMPORTANT...

Страница 2: ...s to commercial and institutional purchasers only each unit free from defects in material and workmanship under normal use and service upon the following terms and conditions 1 This warranty is limite...

Страница 3: ...trol Installation Instructions MF2939 BIR 9 17 2003 Washfountain Components Parts included with the Wall Hung Tri Fount Separate all parts from packaging materials and ensure you have all the parts re...

Страница 4: ...sure the frame is level when using as a template for drilling anchor holes 3 Drill four 1 2 diameter holes in the wall using the frame as a template 4 Secure the pedestal frame to the wall anchors us...

Страница 5: ...ly piping after you have read the following The stop check valve must be used in order to provide proper cross flow checking No other stops are required These stops MUST be fully opened for proper ope...

Страница 6: ...embly so that the exposed portions of the screws fit into the slots on the frame assembly Slide the pedestal panel toward the wall until the screws fit in the narrow end of the notches in the frame as...

Страница 7: ...ll the 2 wall anchor brackets to the back of the bowl using the 3 8 16 x 2 hex head bolts 13 32 I D plain washers anchor plates lockwashers and hex nuts provided as shown in Figure 4 4 Remove valve bo...

Страница 8: ...s together to mount each valve box Step 6 Connect incoming supply lines 1 FOR HOT AND COLD SUPPLY Connect the flexible hoses installed to the Vernatherm Mixing Valve to the hot and cold water supply p...

Страница 9: ...d Hose To Cross Flexible Braided Hose To Cross Step 7 Connect sprayhead supply lines 1 Attach each piece of 1 4 O D plastic tubing from the sprayhead assemblies to the valve boxes see Figures 7a and 7...

Страница 10: ...nstructions 9 17 2003 Installation Instructions continued Step 8 Installing the batteries 1 Remove the four Phillips head screws from the valve box cover see Figure 8a 2 Install twelve AA alkaline bat...

Страница 11: ...nge Adjustment NOTE Complete only if range adjustment is required NOTE The range is factory preset at approximately six inches To adjust the activation range follow the procedure outlined below 1 Open...

Страница 12: ...x 3 8 screw supplied through the welded nut on the bottom flange of the access panel see Figure 10 DO NOT tighten 2 Position the access panel by sliding the screw into the bracket slot on the pedesta...

Страница 13: ...the Terreon Solid Surface material Bradley recommends additional care and maintenance for the darker colored Terreon for complete instructions on this additional maintenance see Bradley document 1505...

Страница 14: ...the manufactures instructions Many of these products leave a protective coating the helps prevent future smears and fingerprints Grease and Oil To remove grease and oil use a quality commercial deter...

Страница 15: ...ace the diaphragm in the proper orientation and secure with the screws 4 Replace the valve box cover Problem An individual operating station fails to turn on Cause A failed coil for the valve or loose...

Страница 16: ...is trapped in the strainers in supply line or valve box Solution Remove debris Supply Line Strainers 1 Turn off the stop s for the supply inlet s 2 Unscrew the large end of the braided hose and remove...

Отзывы: