4
Bradley Corporation • 215-1372 Rev. F; EN 03-045
Terreon® Tri-Fount™ Wall-Hung Washfountain with Battery-Operated Infrared Control
MF2939/BIR
Installation Instructions
9-17-2003
Installation Instructions
Step 1: Rough-in piping and install wall anchors
NOTE: See Figure 1 for piping rough-in dimensions and wall anchor locations.
IMPORTANT: Compliance and conformity to local codes and ordinances is the
responsibility of the installer.
IMPORTANT: Make sure that the water is completely shut off before beginning
installation.
1. Rough-in hot and cold supply lines through the wall.
2. Rough-in a drain waste connection through the wall.
IMPORTANT: Make sure the frame is level when using as a template for drilling
anchor holes.
3. Drill four 1/2" diameter holes in the wall using the frame as a template.
4. Secure the pedestal frame to the wall anchors using four 3/8" diameter bolts and washers
(supplied by installer).
IMPORTANT: Wall anchors need to withstand 1000 lb. pull force.
FINISHED FLOOR
FINISHED FLOOR
10"
(254)
8-1/2"
(216)
26-1/2"*
(660)
25-1/2"*
(648)
27-1/2"*
(699)
23-1/4"*
(591)
2-1/2"
(64)
4-1/4"
(108)
1-1/2" NPT WASTE CONNECTION
FOR USE WITH 1-1/2" TUBULAR
P-TRAP – STUB OUT MIN. 2"
1/2" HOT SUPPLY
(STUB OUT
1" FROM WALL)
1/2" COLD SUPPLY
(STUB OUT MIN.
1" FROM WALL)
28"*
(711)
10"
(254)
10"
(254)
18-3/4"*
(476)
10"
(254)
20"
(508)
OUTLINE OF MOUNTING
PANEL OPENING
(6) APPROPRIATE ANCHORS
AND 3/8" BOLTS (SUPPLIED
BY INSTALLERS) TO MOUNT
BOWL TO WALL
OUTLINE OF
MOUNTING PANEL
Figure 1
* Subtract 4" from this dimension for juvenile height model.